MR. DINESH GOEL (DIR.) M/S ERA INFRA LTD.
Name Of The Project | : | CHHATISH GARH ASSEMBLY. |
---|---|---|
Address Of The Project | : | Village- Rakhi, Naya Raipur, Chhatishgarh. |
Value Of Project | : | 2213 Lacs. |
Period Of Completion | : | Completed |
Client | : |
Chief Executive Officer, NRDA Naya Raipur Development Authority Near Mantralaya Mahanadi Dwar Raipur 492 001, Chhattisgarh |
Consultant | : | U.C. Jain Architects Pvt. Ltd., Mumbai |
MR. S. D. SHARMA (Director). M/S ANSAL API PLAZA
Name Of The Project | : | M/S ANSAL PLAZA |
---|---|---|
Address Of The Project | : | Mall Road, Ludhiyana. Panjab |
Value Of Project | : | 476.63 Lacks |
Period Of Completion | : | Completed |
Client | : | Enersave Consultant Pvt. Ltd |
Consultant | : | Mr. Rawat |
MR. R. N TYAGI (VP) ORCHID INFRASTRUCTURE DEVELOPERS PVT. LTD.
Name Of The Project | : | M/S ORCHID PETAL |
---|---|---|
Address Of The Project | : | Sohna Road, Sector – 49, Gurgaon |
Value Of Project | : | 845.50 Lacks |
Period Of Completion | : | Completed |
Client | : | Krim Engineering Services (P) Limited |
Consultant | : | Mr. MukeshAsija |
MR. SHAILESH KUMAR (Dir.) APEEJAY SURRENDRA PARK HOTELS LTD
Name Of The Project | : | M/S THE PARK |
---|---|---|
Address Of The Project | : | Beach Road, Vishakhapatnam. ( A. P.) |
Value Of Project | : | 280.21 Lacks |
Period Of Completion | : | Completed |
Client | : | Ener save Consultant Pvt. Ltd. |
Consultant | : | Mr. Rawat |
MR. P. C. BIRLA( G. M. Contract ). M/S PARSVANATH DEVELOPERS LTD
Name Of The Project | : | M/S CITY MALL |
---|---|---|
Address Of The Project | : | Sector – 12, Faridabad |
Value Of Project | : | 418 Lacs |
Period Of Completion | : | Completed |
Client | : | G. P. MATHUR & ASSOCIATES PVT. LTD. |
Consultant | : | MadhuBarthwal |
MR. RAJESH YADAV ( M. D. ) M/S R-TECH DEVELOPERS
Name Of The Project | : | M/S CAPITAL MALL |
---|---|---|
Address Of The Project | : | Sector – 6, Bhiwadi |
Value Of Project | : | 102 Lacs |
Period Of Completion | : | Completed |
Client | : | G. P. MATHUR & ASSOCIATES PVT. LTD |
Consultant | : | MadhuBarthwal |
MJR. GEN. (Rtd) DALJIT singh(VP) M/S JAYPEE GREENS
Name Of The Project | : | M/S JAYPEE GREENS |
---|---|---|
Address Of The Project | : | Surajpur–Kasna Road Sport Complex, Gr. Noida |
Value Of Project | : | 213 Lacs |
Period Of Completion | : | Completed |
Client | : | SPC ENGINEERS (P) LIMITED |
Consultant | : | Mr. AmitJouhari |
Mr. Prem Pal Gandhi, MD (K.C. GROUP, WALIA TRADERS)
Name Of The Project | : | KC GRAND HOTEL |
---|---|---|
Address Of The Project | : | Sector-3, Panchkulla |
Value Of Project | : | 390Lacs |
Period Of Completion | : | Completed |
Client | : | SPECTRAL SERVICES PVT. LTD |
Consultant | : | Mr. Midha |
Mr. V. K. Bhatia , ( MD, M/S SAPTARISHI BUILDERS PVT. LTD.)
Name Of The Project | : | M/S QUETTA CGH SOCIETY LTD |
---|---|---|
Address Of The Project | : | Plot No. 5C, Sector – 22, Dwarka, Delhi |
Value Of Project | : | 29.58 Lacks |
Period Of Completion | : | Within 4 Months. |
System Installations | : | Fire Fighting, Alarm & Plumbing Works. |
Mr. S.C. Jain, ( Tech. & Fin. Consultant, M/S CROWN CGH SOCIETY LTD.)
Name Of The Project | : | M/S CROWN CGH SOCIETY LTD |
---|---|---|
Address Of The Project | : | Plot No. 18B , Sector – 07 , Dwarka, Delhi |
Value Of Project | : | 30.22 lacks |
Period Of Completion | : | Within 5 Months |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. S.C. Jain , (Secretary, M/S JAI BHAWANI CGH SOCIETY LTD.)
Name Of The Project | : | M/S JAI BHAWANI CGH SOCIETY LTD |
---|---|---|
Address Of The Project | : | Plot No. 5A , Sector – 22 , Dwarka, Delhi |
Value Of Project | : | 30.22 lacks |
Period Of Completion | : | Within 5 Months |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. V. K. Bhatia , ( MD, M/S SAPTARISHI BUILDERS PVT. LTD.)
Name Of The Project | : | M/S VEGSANCHAR VIHAR CGH SOCIETY |
---|---|---|
Address Of The Project | : | Plot No. 19B , Sector - 06, Dwarka, New Delhi |
Value Of Project | : | 32.28 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Kalra, ( Managing Director, M/S APD BUILDERS PVT. LTD.)
Name Of The Project | : | M/S BAIRWA BHARTI CGH SOCIETY LTD |
---|---|---|
Address Of The Project | : | Plot No–24 , Sector – 12, Dwarka, New Delhi |
Value Of Project | : | 21.28 lack |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Dr. Ashok Anand , ( Hony. Secretary , M/S MEDINOVA CGH SOCIETY LTD. )
Name Of The Project | : | M/S MEDINOVA CGH SOCIETY LTD |
---|---|---|
Address Of The Project | : | Plot No.-50 , Sector – 56, Gurgaon |
Value Of Project | : | 15.86 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Sachdeva, ( MD, M/S ATM ESTATES & BUILDERS PVT. LTD.)
Name Of The Project | : | M/S SWAMI DAYANAND CGHS LTD |
---|---|---|
Address Of The Project | : | Plot no.- 5 , Sector – 6 , Dwarka, New Delhi |
Value Of Project | : | 24.84 Lacks |
Period Of Completion | : | Within 5 Months |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. K. S. Chouhan , ( Hony. Secretary , M/S INDRAPRASTHA CGHS LTD. )
Name Of The Project | : | M/S INDRAPRASTHA CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No.- E8/B , Sector – 61, Noida |
Value Of Project | : | 20.98 Lacks |
Period Of Completion | : | Within 2 Months |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Bisnoi, ( Hony Secretary, M/S BHAGWANTI CGHS LTD. )
Name Of The Project | : | M/S BHAGWANTI CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No. 83, Sec-56, Gurgaon |
Value Of Project | : | 15.25 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Hitesh Jain, ( Managing Director, M/S REAL SALES PVT. LTD. )
Name Of The Project | : | M/S PROGRESSIVE CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No. 69, Sec-56, Gurgaon |
Value Of Project | : | 32.01 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Hitesh Jain, MD (M/S NEW DELHI LAND CONSORTIUM )
Name Of The Project | : | Corporate Office |
---|---|---|
Address Of The Project | : | Plot No. 4,5,6, New Rajendra Nagar, Delhi |
Value Of Project | : | 37.87 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting&Alarm Systems |
Mr. Hitesh Jain, MD (M/S NEW DELHI LAND CONSORTIUM )
Name Of The Project | : | Residential Appartment |
---|---|---|
Address Of The Project | : | Plot No. 857, New Rajendra Nagar, Delhi |
Value Of Project | : | 7.50 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting Systems |
Mr. AJEET SINGH. ( President, GREEN HOME CGHS LTD )
Name Of The Project | : | M/S GREEN HOME CGHS |
---|---|---|
Address Of The Project | : | Plot No. 04, Sector -52, Gurgaon |
Value Of Project | : | 16.60 Lacks |
Period Of Completion | : | Fire Fighting, Alarm & Plumbing Works |
System Installations | : | Completed |
Mr. P.K. Gupta ( President, M/S NEW WELCOME CGHS LTD.)
Name Of The Project | : | M/S NEW WELCOME CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No. 36C, Sec-56, Gurgaon |
Value Of Project | : | 16.25 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Bharat Bhushan ( M/S THE NEW ENGINEERS CGHS LTD.)
Name Of The Project | : | M/S THE NEW ENGINEERS CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No.4, Sec - 39, Gurgaon |
Value Of Project | : | 27.00 Lacks |
Period Of Completion | : | Fire Fighting, Alarm & Plumbing Works |
System Installations | : | Completed |
Mr. Rajesh Mittal ( M/S GOLDEN JUBLEE CGHS LTD.)
Name Of The Project | : | M/S GOLDEN JUBLEE CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No.89, SEC-54,Gurgaon |
Value Of Project | : | 27.52 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting&Alarm Systems |
Mr. Rajesh Mittal ( M/S GOLDEN JUBLEE CGHS LTD.Part-II)
Name Of The Project | : | M/S GOLDEN JUBLEE CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No.89, SEC-54,Gurgaon |
Value Of Project | : | 34.54 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting&Alarm Systems |
Mr. Rajesh Mittal ( M/S ATLANTIS CGHS LTD.Part-II)
Name Of The Project | : | M/S ATLANTIS CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No.11, SEC-47,Gurgaon |
Value Of Project | : | 25.25 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting&Alarm Systems |
Mr. Rajesh Mittal ( M/S ANNA CGHS LTD.)
Name Of The Project | : | M/S ANNA CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No.06, SEC-47,Gurgaon |
Value Of Project | : | 39.95 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Rajesh Mittal ( M/S NESTLE CGHS LTD.)
Name Of The Project | : | M/S NESTLE CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No.04, SEC-45,Gurgaon |
Value Of Project | : | 22.95 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. R. N. BANSAL ( Secretary, M/S CLIMAX CGHS LTD.)
Name Of The Project | : | M/S CLIMAX CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No.04, SEC-14,Rohini, New Delhi |
Value Of Project | : | 22.80 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. H.S LAMBA ( M.D. M/S SNEH GROUP LTD.)
Name Of The Project | : | M/S GTM RESIDENCY, ANSALS TOWERS |
---|---|---|
Address Of The Project | : | Tower No. 11, Faridabad Road, Gurgaon |
Value Of Project | : | 32.50 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Col. Sharma ( M/S G.E.E. CGHS LTD.)
Name Of The Project | : | M/S GEE CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No. 12, Sector – 47, Gurgaon |
Value Of Project | : | 34.50 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting & Alarm Systems |
Mr. Pankaj Lahoti ( M/S CHHATISHGARH PROJECTS PVT. LTD.)
Name Of The Project | : | M/S WALLFORTE ENCLAVE, Raipur |
---|---|---|
Address Of The Project | : | VIP Road, Raipur |
Value Of Project | : | 26.00 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. D.P. GUPTA ( M.D. M/S TRISHUL TOWERS PVT. LTD.)
Name Of The Project | : | M/S GREEN WOOD CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No - 6, Sector – 52, Gurgaon |
Value Of Project | : | 21.77 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. JoginderKadyan ( Secretary, M/S THE BIMLA CGHS LTD.)
Name Of The Project | : | The Bimla CGHS Ltd |
---|---|---|
Address Of The Project | : | Plot no. 6A, Sector-39, Gurgaon |
Value Of Project | : | 52.50 Lacks |
Period Of Completion | : | Running |
System Installations | : | S/I/T/C of Fire Fighting Systems |
Mr. Malik ( Secretary. M/S HERMITAGE CGHS LTD.)
Name Of The Project | : | M/S HERMITAGE CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No – 2, Sector – 28, Gurgaon |
Value Of Project | : | 35.00 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting & Alarm Systems |
Mr. R.N. Tyagi ( V. P. M/S ORCHID INFRA. DEVELOPERS PVT. LTD.)
Name Of The Project | : | M/S ORCHID PETAL Basement-1 |
---|---|---|
Address Of The Project | : | Sohna Road, Sector – 49, Gurgaon |
Value Of Project | : | 45.50 Lacks. (Only Basement) |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting & Alarm Systems |
Mr. Satbeer Singh ( Administrator, M/S BATUK JI CGHS LTD.)
Name Of The Project | : | M/S BATUKJI CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No. 5B, Sector – 03, Gurgaon |
Value Of Project | : | 27.50 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting & Alarm Systems |
Mr. Satbeer Singh ( Administrator, M/S KUNJ VIHAR CGHS LTD.)
Name Of The Project | : | M/S KUNJ VIHAR CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No. 19, Sector – 12, Gurgaon |
Value Of Project | : | 63.50 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting & Alarm Systems |
Mr. Ajay Prakash Sharma ( VP, M/S ANSAL API LTD.)
Name Of The Project | : | M/S SUNSHINE COUNTY |
---|---|---|
Address Of The Project | : | Karnal National Highway, Kundli, Sonepat |
Value Of Project | : | 463.50 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Plumbing Systems |
Mr. Deepak Mathur( VP, M/S JAYPEE ASSOCIATES LTD.)
Name Of The Project | : | M/S JAYPEE GREENS |
---|---|---|
Address Of The Project | : | SurajPurKasna Road, Gr. Noida |
Value Of Project | : | 1369.50 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Plumbing Systems |
Mr. Sushil Kumar ( Secretary, M/S THE NEW PARADISE CGHS LTD.)
Name Of The Project | : | The New Paradise CGHS Ltd |
---|---|---|
Address Of The Project | : | Plot no. 5, Sector-39, Gurgaon |
Value Of Project | : | 52.50 Lacks |
Period Of Completion | : | Running |
System Installations | : | S/I/T/C of Fire Fighting Systems |
Mr. Sunil Gupta ( VP projects, M/S BPTP LTD.)
Name Of The Project | : | EWS Block, Park Prime |
---|---|---|
Address Of The Project | : | Plot no. , Sector-66, Gurgaon |
Value Of Project | : | 12.50 Lacks |
Period Of Completion | : | Running |
System Installations | : | S/I/T/C of Fire Fighting Systems |
Mr. H.K. Gupta, ( Managing Director, M/S UNIQUE ASSOCIATES PVT. LTD.)
Name Of The Project | : | M/S ESPN STARSPORTS LTD |
---|---|---|
Address Of The Project | : | LSC, Madangir , New Delhi |
Value Of Project | : | 23.25 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. J. S. Jaggi , ( General Manager, M/S BHARTI CELLULAR LTD. )
Name Of The Project | : | M/S BHARTI CELLULAR LTD |
---|---|---|
Address Of The Project | : | D-184, OkhlaPh-I, New Delhi |
Value Of Project | : | 24.15 lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Bharat Bhusan ( M/S INDESIGN PVT. LTD.)
Name Of The Project | : | M/S INDESIGN PVT. LTD |
---|---|---|
Address Of The Project | : | Commercial Complex at Sector–14, Gurgaon |
Value Of Project | : | 16.00 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. BrijeshGoel ( M.D. M/S INDO NIPPON FOODS LTD.)
Name Of The Project | : | M/S INDO NIPPON FOODS LTD |
---|---|---|
Address Of The Project | : | Plot No - 34, Sector – 32, Gurgaon |
Value Of Project | : | 19.50 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Ravin Kumar ( Mgr, SPANCO TELE-SYSTEMS SOLUTIONS PVT. LTD.)
Name Of The Project | : | M/S NEEL INTERNATIONAL |
---|---|---|
Address Of The Project | : | Plot No – 96-97, UdyogVihar – IV, Gurgaon |
Value Of Project | : | 53.08 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Krishan Kr. Gupta ( M.D. M/S MEET INVESTMENTS PVT. LTD.)
Name Of The Project | : | M/S U.TV LTD |
---|---|---|
Address Of The Project | : | Plot No - 18, Sector – 16, Noida |
Value Of Project | : | 17.50 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Krishan Kr. Gupta ( M.D. M/S R.N.K. EXIM PVT. LTD.)
Name Of The Project | : | M/S U.TV LTD |
---|---|---|
Address Of The Project | : | Plot No - 18, Sector – 16, Noida |
Value Of Project | : | 17.50 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Dharmender Gupta ( M.D. M/S ASMARA INDIA PVT. LTD.)
Name Of The Project | : | ASMARA INDIA PVT. LTD |
---|---|---|
Address Of The Project | : | Plot No - 108, Sector – 3, IMT, Manesar |
Value Of Project | : | 9.75 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting &Alarm Systems |
Mr. Lalit Sharma ( Manager, M/S CDAC NOIDA.)
Name Of The Project | : | M/S CDAC , NOIDA |
---|---|---|
Address Of The Project | : | Plot No – C-56/1, Sector -62, Noida |
Value Of Project | : | 1.00 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Maintenances of Fire Fighting Systems |
Mr. S.K. Rathod ( Director, ECOGUARD TECHNOLOGIES PVT. LTD.)
Name Of The Project | : | M/S CSR (Non GovernmentOrganization) |
---|---|---|
Address Of The Project | : | Plot No – 98, Sector -44, Gurgaon |
Value Of Project | : | 23.40 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting Systems |
Mr. Ravin Kumar ( Mgr, SPANCO TELE-SYSTEMS SOLUUTIONS PVT. LTD.)
Name Of The Project | : | M/S SPANCO BPO |
---|---|---|
Address Of The Project | : | Plot No – 21B, Sector - 18, Gurgaon |
Value Of Project | : | 23.08 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Wadhwa ( CFA, M/S CLASSIC OVERSEASE PVT. LTD.)
Name Of The Project | : | M/S CLASSIC OVERSEASE PVT. LTD |
---|---|---|
Address Of The Project | : | Plot No –39, PusaRaod, New Delhi |
Value Of Project | : | 28.08 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Sehgal(M/S INTRADING PVT. LTD.)
Name Of The Project | : | INTRADING PVT. LTD. |
---|---|---|
Address Of The Project | : | Plot No –33, Sector-3, IMT, Manesar |
Value Of Project | : | 8.08 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting& Alarm Systems |
MD. ALI ( Owner , M/S Mohd. Aasqueen.)
Name Of The Project | : | M/S Mohd. Aashqueen |
---|---|---|
Address Of The Project | : | Plot No –308, UDV Phase –II, Gurgaon |
Value Of Project | : | 19.5 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting Systems |
Mr. Raj Kapoor, MD ( M/s Great India Nautanki Company.)
Name Of The Project | : | M/S Great India Nautanki Company |
---|---|---|
Address Of The Project | : | Near 32 Milestone, Gurgaon |
Value Of Project | : | 11 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting Systems |
I.S. YADAV ( Project Controller, M/S V.R. Placements Pvt. Ltd.)
Name Of The Project | : | M/S V.R. Placements Pvt. Ltd |
---|---|---|
Address Of The Project | : | Plot No –129, Sector-44, Gurgaon |
Value Of Project | : | 79.5 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting Systems |
ReenaSehdeo( VP, M/S MGI India Pvt. Ltd.)
Name Of The Project | : | MGI India Pvt. Ltd |
---|---|---|
Address Of The Project | : | Plot No –109, Sector-44, Gurgaon |
Value Of Project | : | 19.29 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting Systems |
N. M. Mittal ( Project Controller, M/S MVL Ltd.)
Name Of The Project | : | M/S Socomac Ltd |
---|---|---|
Address Of The Project | : | MVL iPark, Sector-15, Gurgaon |
Value Of Project | : | 10.5 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting Systems |
N. M. Mittal ( Project Controller, M/S Satya Developers Ltd.)
Name Of The Project | : | M/S Satya Developers Ltd |
---|---|---|
Address Of The Project | : | Corporate Building, Sector-44, Gurgaon |
Value Of Project | : | 19.85 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting & Alarm Systems |
N. M. Mittal ( Project Controller, M/S MVL Ltd.)
Name Of The Project | : | M/S ECI Ltd |
---|---|---|
Address Of The Project | : | MVL iPark, Sector-15, Gurgaon |
Value Of Project | : | 19.5 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting Systems |
Suresh Raina( Purchase Head, M/S Indus Tower Ltd.)
Name Of The Project | : | M/S Indus Tower Ltd |
---|---|---|
Address Of The Project | : | DLF Cyber Park, Building No.9, Gurgaon |
Value Of Project | : | 59.85 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting, Alarm& Plumbing |
Mr. P.C. Birla, ( G.M., M/S PARSVNATH DEVELOPERS LTD. )
Name Of The Project | : | M/S CITYMALL |
---|---|---|
Address Of The Project | : | Sector – 12, Faridabad |
Value Of Project | : | 1.18 Crore |
Period Of Completion | : | Completed |
System Installations | : | S.I.T.C. of Fire hydrant, Sprinklers, AutomaticDetection Systems. |
Mr. P.C. Birla, ( G.M., M/S PARSVNATH DEVELOPERS LTD. )
Name Of The Project | : | M/S KOUSAMBHI MALL ( Shopping Mall) |
---|---|---|
Address Of The Project | : | Near Dabur, Ghaziabad ( U.P. ) |
Value Of Project | : | 86 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm Systems. |
Mr. Rajendra Tokes, ( Owner, M/S LAXMAN SINGH COMPLEX - II )
Name Of The Project | : | M/S LAXMAN SINGH COMPLEX - II |
---|---|---|
Address Of The Project | : | Munirka, New Delhi |
Value Of Project | : | 38.26 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S.I.T.C. of Fire hydrant, Sprinklers, Automatic Detection Systems |
Mr. Ajit Singh ( M.D. M/S ARROW HEAD ENGINEERS PVT. LTD.)
Name Of The Project | : | M/S ABHAY KHAND SHOPING COMPLEX |
---|---|---|
Address Of The Project | : | Plot No–1,Abhay Khand–III,Indrapuram, Gzb |
Value Of Project | : | 51.77 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Ramesh Yadav ( M.D. M/S AMIT BUILDWELL PVT. LTD.)
Name Of The Project | : | M/S JMD GALLERIA |
---|---|---|
Address Of The Project | : | Sohna Road, Gurgaon |
Value Of Project | : | 1.03 Crore |
Period Of Completion | : | SITC of Fire Fighting & Alarm Systems |
System Installations | : | Completed |
Mr. S.D. Sharma ( Director, M/S ANSAL API LTD.)
Name Of The Project | : | M/S ANSAL PLAZA |
---|---|---|
Address Of The Project | : | Mall Road, Ludhiana |
Value Of Project | : | 49.13 Lac |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting Systems |
Mr. S.D. Sharma ( Director, M/S ANSAL API LTD.)
Name Of The Project | : | M/S ANSAL PLAZA |
---|---|---|
Address Of The Project | : | Mall Road, Ludhiana |
Value Of Project | : | 27.50 Lac |
Period Of Completion | : | Completed |
System Installations | : | SITC of Plumbing Works |
Mr. N.C. Jain , ( Hony. Chainman, M/S HERITAGE PUBLIC SCHOOL. )
Name Of The Project | : | M/S HERITAGE PUBLIC SCHOOL |
---|---|---|
Address Of The Project | : | Sector – 57, Gurgaon |
Value Of Project | : | 47.89 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire hydrant, Sprinkler & Detection System |
Mr. N.C. Jain , (Chairman, M/S LORD KRISHNA EDUCA. SOCIETY LTD. )
Name Of The Project | : | M/S HERITAGE PUBLIC SCHOOL |
---|---|---|
Address Of The Project | : | Plot No- 25 , Sector– 23, Rohini, New Delhi |
Value Of Project | : | 41.15 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire hydrant, Sprinklers,Alarm Systems |
Mr. Naveen Gupta, Architect ( M/S PARKVIEW CGHS LTD. )
Name Of The Project | : | PARKVIEW CGHS LTD |
---|---|---|
Address Of The Project | : | Plot No- 12 , Sector– 56, Gurgaon |
Value Of Project | : | 34.87 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire hydrant, Sprinklers,Alarm Systems |
Mr. S.K. Sharma ,( Project Manager , M/S G.D. GOENKA PUBLIC SCHOOL. )
Name Of The Project | : | M/S G.D. GOENKA PUBLIC SCHOOL |
---|---|---|
Address Of The Project | : | Sohna Road , Gurgaon |
Value Of Project | : | 03.13 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S.I.T.C. of Fire Hydrant Systems |
Mr. VIRENDRA SEHGAL. (rep.)
Name Of The Project | : | M/S NATIONAL BRAIN RESERCH CENTRE |
---|---|---|
Address Of The Project | : | IMT, Maneasr, Gurgaon |
Value Of Project | : | 44.60 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Addressable Fire Alarm Systems |
Mr. KapilSachdeva, ( Secretary, SANT NAMDEV EDUCATIONAL SOCIETY. )
Name Of The Project | : | MOTHERS PRIDE SCHOOL |
---|---|---|
Address Of The Project | : | Sector-6,dwarka NEW DELHI |
Value Of Project | : | 26.56 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting Systems |
Mr. Sandhu (MANJIT MEMORIAL PREMIAR INSTITUTE OF EDUCA.)
Name Of The Project | : | M/S MOTHERS PRIDE SCHOOL |
---|---|---|
Address Of The Project | : | Plot No.4103, DLF-IV,Gurgaon |
Value Of Project | : | 25.51 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Varun Sharma ( M/S MVN PUBLIC SCHOOL.)
Name Of The Project | : | M/S MVN PUBLIC SCHOOL |
---|---|---|
Address Of The Project | : | 72 Km Stone, Mathura Road , Palwal |
Value Of Project | : | 67.68 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Subroto Roy ( M/S JAI RADHE-RAMAN EDUCATIONAL SOCIETY.)
Name Of The Project | : | M/S Educomp-Raffel University |
---|---|---|
Address Of The Project | : | Knowledge Park-IV, Gr. Noida |
Value Of Project | : | 267.68 Lacks/td> |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mjr. VirendraVikram, VP ( M/S EDUCOMP INTERNATIONAL.)
Name Of The Project | : | M/S Educomp Internal |
---|---|---|
Address Of The Project | : | Plot No.327, Udyogvihar, Phase-IV, Gurgaon |
Value Of Project | : | 267.68 Lacks |
Period Of Completion | : | Fire Fighting, Alarm & Plumbing Works |
System Installations | : | Completed |
Col. Anil Manray, (Director, Dte.of Standardization, Min. of Def.)
Name Of The Project | : | Data Networking Center at SenaBhawan |
---|---|---|
Address Of The Project | : | ‘H’ Block, SenaBhawan. South Block |
Value Of Project | : | 5.52 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S.I.T.C. of Wireless Detection Systems |
Mr. Amarjeet Singh, ( Co-ordinator, UJBEKISTAN EMBASSY )
Name Of The Project | : | M/S UJBEKISTAN EMBASSY |
---|---|---|
Address Of The Project | : | ChanakyaPuri, New Delhi |
Value Of Project | : | 10.23 Lacks |
Period Of Completion | : | |
System Installations | : |
Dr. Ananad, ( Chairman, ANAND MEDICAL CENTER)
Name Of The Project | : | M/S ANAND MEDICAL CENTRE |
---|---|---|
Address Of The Project | : | Plot No. 271, Sec-56, Gurgaon |
Value Of Project | : | 13.64 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire hydrant, Sprinklers, Alarm Systems |
Dr. Lal, ( Chairman, M/S DR. R.L. KHERA CHERITABLE TRUST )
Name Of The Project | : | RLKC METRO HOSPITAL & HEART INST |
---|---|---|
Address Of The Project | : | Patel Nagar, New Delhi |
Value Of Project | : | 33.64 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire hydrant, Sprinklers, Alarm Systems |
Mr. Aggarwal, ( Chairman, ORANGE SPA HOTELS & RESORTS PVT. LTD.)
Name Of The Project | : | ORANGESPA HOTEL& RESORTS PVT LTD |
---|---|---|
Address Of The Project | : | 59, Mile Stone, Jaipur Highway, Bhiwadi |
Value Of Project | : | 48.55 Lac |
Period Of Completion | : | Completed |
System Installations | : | Fire hydrant, SprinklersDetection Systems |
Mr. Sailesh Kumar, (Director, APEEJAY SURRENDRA PARK HOTELS LTD.)
Name Of The Project | : | M/S THE PARK HOTELS |
---|---|---|
Address Of The Project | : | Beach Road, Vishakhapatnam, (A.P.) |
Value Of Project | : | 40.21 Lac |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. PremPal Gandhi, (M.Director, M/S WALIA TRADERS LTD.)
Name Of The Project | : | M/S KC ROYAL PARK HOTELS |
---|---|---|
Address Of The Project | : | Sector -3, Panchkulla (Haryana) |
Value Of Project | : | 390 Lac |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Sunil Bedi, (M.Director, M/S JMD LTD.)
Name Of The Project | : | M/S HILTON HOTELS |
---|---|---|
Address Of The Project | : | Sector -56, Gurgaon (Haryana) |
Value Of Project | : | 840 Lac |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Sunil Galgotia, (Director, GALGOTIA HOTELS & RESORTS PVT. LTD.)
Name Of The Project | : | M/S GALGOTIA HOTELS |
---|---|---|
Address Of The Project | : | Plot No. 23-24, Sector-23A, Gurgaon |
Value Of Project | : | 132 Lac |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Amarjit Singh, (Director, M/S SPICE TOWERS & RESORTS PVT. LTD.)
Name Of The Project | : | M/S HOMETEL HOTELS |
---|---|---|
Address Of The Project | : | Dehradun Road, Roorkee, Uttarakhad |
Value Of Project | : | 192 Lac |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Anil Madhok, (Director, M/S SAROVAR HOTELS PVT. LTD.)
Name Of The Project | : | HOMETEL HOTELS |
---|---|---|
Address Of The Project | : | Sector-34, Chandigarh |
Value Of Project | : | 202 Lac |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Dinesh Goel, (GM, M/S ERA DEVELOPERS LTD.)
Name Of The Project | : | CHHATISH GARH ASSEMBLY BUILDING |
---|---|---|
Address Of The Project | : | Capitol Complex, Raipur |
Value Of Project | : | 2213 Lac |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Dr. D. Paharya, ( M/S UNITECH SOUTHCITY HOSPITALS.)
Name Of The Project | : | M/S UNITECH SOUTHCITY HOSPITALS |
---|---|---|
Address Of The Project | : | South City Market, GUrgaon |
Value Of Project | : | 121 Lac |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. S.L. Suri , ( Managing Director, M/S CHASE APPAREL PVT. LTD.)
Name Of The Project | : | M/S CHASE APPAREL PVT. LTD |
---|---|---|
Address Of The Project | : | Plot No. 360, UdhyogViharPh-IV, Gurgaon |
Value Of Project | : | 19.96 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Sharad Mittal, GM (M/S MEDIPLUS PVT. LTD.)
Name Of The Project | : | MEDIPLUS PVT. LTD |
---|---|---|
Address Of The Project | : | Bahdurgarh Industrial Area |
Value Of Project | : | 39.76 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting&Alarm Systems |
Mr. A. k. Pandey, ( Proprietor, M/S DKD ENGINEERS. )
Name Of The Project | : | M/S AVIOILLTD |
---|---|---|
Address Of The Project | : | Joint Venture of INDIAN OIL, Piyala, Fbd |
Value Of Project | : | 40.13 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Gupta, ( General Manager , V.K. INTERNATIONAL )
Name Of The Project | : | M/S V.K. INTERNATIONAL |
---|---|---|
Address Of The Project | : | Plot No. 423, UdhyogVihar, Gurgaon |
Value Of Project | : | 30.68 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. L.S.N. Sahdeo ( Vice President, M/S ENKEI CASTALLOYS LTD.)
Name Of The Project | : | M/S ENKEI CASTALLOY LTD |
---|---|---|
Address Of The Project | : | Binola Industrial Area, Gurgaon |
Value Of Project | : | 49.25 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Pandey ( M.D. M/S DKD ENGINEERS PVT. LTD.)
Name Of The Project | : | M/S DANISCO.(India – Denmark Ventures) |
---|---|---|
Address Of The Project | : | Sohana, Haryana |
Value Of Project | : | 12.78 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Azad ( Proprietor, M/S P.P. ENGINEERING WORKS.)
Name Of The Project | : | M/S GINNI FILAMENTS LTD |
---|---|---|
Address Of The Project | : | H-6, SEC-63, NOIDA |
Value Of Project | : | 14.26 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mrs. Sobha( VP, M/S UTV ENTAITMENT LTD.)
Name Of The Project | : | M/S UTV LTD |
---|---|---|
Address Of The Project | : | Plot No. 49, SEC-15, NOIDA |
Value Of Project | : | 29.76 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting &Alarm Systems |
Mr. Narula ( M/S KALAKAR PRINT LTD.)
Name Of The Project | : | M/S KALAKAR PRINT LTD |
---|---|---|
Address Of The Project | : | Plot No. 229,Phase-I, U.V. Gurgaon |
Value Of Project | : | 46.25 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. RAMESH KUMAR ( M/S AMIT BUILDWELL (P) LTD.)
Name Of The Project | : | M/S MAGIC INTERNATIONAL LTD |
---|---|---|
Address Of The Project | : | Plot No.E-26, SEC-31,G.Noida |
Value Of Project | : | 47.50 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Devender Gupta ( M.D. M/S SMARA APPARELS INDIA LTD.)
Name Of The Project | : | M/S SMARA APPARELS INDIA LTD |
---|---|---|
Address Of The Project | : | Plot No–131, Sector -4, IMT, Manesar |
Value Of Project | : | 17.86Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. Man Mohan ( M.D, M/S MONOCHEM GRAPHICS LTD.)
Name Of The Project | : | M/S MONOCHEM GRAPHICS LTD |
---|---|---|
Address Of The Project | : | Plot No – 134, Sector -8, IMT, Manesar |
Value Of Project | : | 15.86 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. S.S. Dagar ( ESSAN RESEARCH TECHNOLOGIES PVT. LTD.)
Name Of The Project | : | M/S DEGANIA MEDICAL DEVICES |
---|---|---|
Address Of The Project | : | Plot No – 251, Sector -6, IMT, Manesar |
Value Of Project | : | 11.28 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. ARUN VASISTH ( ARUN INDUSTRIES.)
Name Of The Project | : | M/S ARUN INDUSTRIES |
---|---|---|
Address Of The Project | : | Plot No – 277, Phase – IV, UDV, Gurgaon |
Value Of Project | : | 12.35 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mr. ANIL MITTAL ( SSG PHARMA PVT. LTD.)
Name Of The Project | : | M/S SATMOLA FACTORY |
---|---|---|
Address Of The Project | : | Plot No – M-1/3, Site IV, Sahibabad, GZB |
Value Of Project | : | 27.75 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Civil, Mechanical, Electrical & Plumbing |
Mr. RAJKUMAR SRIVASTAVA ( KAMDHENU STEEL)
Name Of The Project | : | M/S KAMDHENU PAINTS |
---|---|---|
Address Of The Project | : | E 538, Industrial Area, Chopanki, Alwar |
Value Of Project | : | 47.16 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S Civil, Mechanical, Electrical & Plumbing |
SWAMI RAMDEV JI MAHARAJ ( PATANJALI YOGPEETH LTD.)
Name Of The Project | : | M/S PATANJALI HERBAL FOOD PARK LTD |
---|---|---|
Address Of The Project | : | Laxar Rad, Padartha Village, Haridwar |
Value Of Project | : | 700 Lacks |
Period Of Completion | : | Running |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
SANDEEP YADAV ( BAYER MATERIAL SCIENCES LTD.)
Name Of The Project | : | M/S BAYER MATERIAL SCIENCES LTD |
---|---|---|
Address Of The Project | : | Sector-alfa, Greator Noida, UP |
Value Of Project | : | 100 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Civil, Mechanical, Electrical & Plumbing |
MR. MIDHA ( KALAMKARI DESIGNS PVT. LTD.)
Name Of The Project | : | M/S KALAMKARI DESIGNS PVT. LTD |
---|---|---|
Address Of The Project | : | Plot No. 121, Pace City, Gurgaon |
Value Of Project | : | 60 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
MR. GOEL ( VMI PLASTICS INDUSTRIES LTD.)
Name Of The Project | : | M/S VMI PLASTICS INDUSTRIES LTD |
---|---|---|
Address Of The Project | : | Electronic City, Sec-18, Gurgaon |
Value Of Project | : | 102 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Fighting, Alarm & Plumbing Works |
Mrs. Sushma ( ALCHEMIST LTD.)
Name Of The Project | : | M/S ALCHEMIST INDUSTRIES LTD |
---|---|---|
Address Of The Project | : | Industrial Area, Baddi. (Himachal) |
Value Of Project | : | 10 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Supply of Fire Extinguishers |
ParamPujyaAacharyaBalkrishnaJi ( PATANJALI AYURVED LTD.)
Name Of The Project | : | M/S PATANJALI HERBAL FOOD PARK LTD |
---|---|---|
Address Of The Project | : | Village – Padartha, Dist- Haridwar, U.K. |
Value Of Project | : | 700 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm Systems |
V.K. Sharma (SRS REAL ESTATE LTD.)
Name Of The Project | : | SRS Residency |
---|---|---|
Address Of The Project | : | Sector-89, Faridabad |
Value Of Project | : | 154 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm Systems |
Sunil Goel (KRISH INFRASTRUCTURES PVT. LTD.)
Name Of The Project | : | KRISH City |
---|---|---|
Address Of The Project | : | Alwar Road, Bhiwadi |
Value Of Project | : | 145 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm Systems |
Sunil Goel (KRISH INFRASTRUCTURES PVT. LTD.)
Name Of The Project | : | KRISH City |
---|---|---|
Address Of The Project | : | Alwar Road, Bhiwadi |
Value Of Project | : | 145 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm Systems |
Rajesh Yadav, MD ( H.C. BUILDCON PVT. LTD.)
Name Of The Project | : | Capital Mall |
---|---|---|
Address Of The Project | : | Sector-6, UIT, Bhiwadi |
Value Of Project | : | 102 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm Systems |
D.N. Kalra, MD ( M.R. CHARITABLE TRUST )
Name Of The Project | : | Marriage Home |
---|---|---|
Address Of The Project | : | Sector-10, Dwarka, New Delhi |
Value Of Project | : | 55 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm Systems |
D.N. Kalra, MD ( PARUPKARI EDUCATIONAL SOCIETY )
Name Of The Project | : | Mothers Pride School |
---|---|---|
Address Of The Project | : | Sector-4, Dwarka, New Delhi |
Value Of Project | : | 24 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm Systems |
Mr. Manmohan ( SUN OVERSEAS)
Name Of The Project | : | SUN OVERSEAS |
---|---|---|
Address Of The Project | : | 291-E, Sector-6, IMT, Manesar |
Value Of Project | : | 18 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm Systems |
Mrs. RituSachdeva ( SIDHARTHA PLAZA )
Name Of The Project | : | SIDHARTHA PLAZA GUESTHOUSE |
---|---|---|
Address Of The Project | : | B-17, Sector-45, Gurgaon |
Value Of Project | : | 48 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm Systems |
Mr. Ashish Srivastava ( Ansal API)
Name Of The Project | : | STATEMAN HOUSE |
---|---|---|
Address Of The Project | : | Innercircle, Barakhambha Road, New Delhi |
Value Of Project | : | 38 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Ringline External |
Mr. Goel, MD ( Polypac India Pvt. Ltd.)
Name Of The Project | : | POLYPAC INDIA PVT. LTD |
---|---|---|
Address Of The Project | : | Plot No. 6, Bawal Industrial Area, Bawal |
Value Of Project | : | 49.56 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm System |
Mr. SudhirBanshal ( MedalionInfotech Pvt. Ltd.)
Name Of The Project | : | MedalionInfotech |
---|---|---|
Address Of The Project | : | Plot No.8, Bawal Industrial Area, Bawal |
Value Of Project | : | 54.44 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm System |
Mr. Rajesh Mittal ( Rose CGHS Ltd.)
Name Of The Project | : | Rose CGHS Ltd. |
---|---|---|
Address Of The Project | : | Plot No.3, Sector-28, Gurgaon |
Value Of Project | : | 24.49 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm System |
Mr. Anil Goel, MD ( PiyushColonisers Ltd.)
Name Of The Project | : | PIYUSH HORIZONS |
---|---|---|
Address Of The Project | : | NHAI, Sector-8, Dharuhera |
Value Of Project | : | 144.99 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm System |
Mr. Anil Goel, MD ( PiyushColonisers Ltd.)
Name Of The Project | : | PIYUSH CITY |
---|---|---|
Address Of The Project | : | Alwar Road, Bhiwadi, Rajasthan |
Value Of Project | : | 129.32 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm System |
Mr. AshuGugnani, MD ( Ravi Bhawan, Raipur.)
Name Of The Project | : | RAVI BHAWAN RAIPUR |
---|---|---|
Address Of The Project | : | Kheri Naka, Raipur, Chattishgarh |
Value Of Project | : | 39.29 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm System |
Mr. Bhupender Gupta, ( Industrial Project)
Name Of The Project | : | Shiv Shankar Yadav |
---|---|---|
Address Of The Project | : | Plot No. 328, Sector-8, IMT Manesar |
Value Of Project | : | 19.88 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm System |
Mr. Shailender Gupta, MD ( Saket Mall Agra)
Name Of The Project | : | SAKET MALL AGRA |
---|---|---|
Address Of The Project | : | Near Flyover, NAHI, Agra |
Value Of Project | : | 34.56 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm System |
Mr. Sunil Gupta ( VP projects, M/S BPTP LTD.)
Name Of The Project | : | EWS Block, Park Resorts |
---|---|---|
Address Of The Project | : | Sector-75, Faridabad |
Value Of Project | : | 22.55 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting Systems |
Mr. Sunil Gupta ( VP projects, M/S BPTP LTD.)
Name Of The Project | : | EWS Block, Park Granduera |
---|---|---|
Address Of The Project | : | Sector-76, Faridabad |
Value Of Project | : | 22.00 Lacks |
Period Of Completion | : | Completed |
System Installations | : | S/I/T/C of Fire Fighting Systems |
Mr. Sunil Gupta ( VP projects, M/S BPTP LTD.)
Name Of The Project | : | BPTP PARK PRIME |
---|---|---|
Address Of The Project | : | Sector-66, Faridabad |
Value Of Project | : | 78.23 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Water Curtain Systems |
Amarjit Singh Dhilon( MAXWORTH INFRSTRUCTURES LTD.)
Name Of The Project | : | PREMIER URBAN |
---|---|---|
Address Of The Project | : | Sector-15, Part-II, Gurgaon |
Value Of Project | : | 255 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Fighting & Alarm Systems |
Amarjit Singh Dhilon(MAXWORTH INFRSTRUCTURES LTD.)
Name Of The Project | : | PREMIER URBAN |
---|---|---|
Address Of The Project | : | Sector-15, Part-II, Gurgaon |
Value Of Project | : | 32 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of 25 KLD Sewerage Treatment Plant |
Amarjit Singh Dhilon(MAXWORTH INFRSTRUCTURES LTD.)
Name Of The Project | : | PREMIER URBAN |
---|---|---|
Address Of The Project | : | Sector-15, Part-II, Gurgaon |
Value Of Project | : | 90 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Heat Ventilation & Exhaust System |
KuldeepNarula(KALAKAR PRINTS PVT. LTD.)
Name Of The Project | : | KALAKAR PRINTS |
---|---|---|
Address Of The Project | : | Plot No. 229. UDV-I, Gurgaon |
Value Of Project | : | 40 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
Ramesh Yadav(AMIT BUILDWELL PVT. LTD.)
Name Of The Project | : | INDIA BULLS |
---|---|---|
Address Of The Project | : | Sector-104, Gurgaon |
Value Of Project | : | 80 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
Subhash Saluja(SALUJA PROPERTIES PVT. LTD.)
Name Of The Project | : | SS HEALTHCARE |
---|---|---|
Address Of The Project | : | Tikri Village, Gurgaon |
Value Of Project | : | 10 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
Kunj Gupta (BHAGWATI FLOOR MILLS PVT. LTD.)
Name Of The Project | : | JRG FOODS PVT. LTD. |
---|---|---|
Address Of The Project | : | Industrial Area Gajraula, UP |
Value Of Project | : | 30 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
Deepak Gupta (SU-KAM LTD.)
Name Of The Project | : | SU-KAM LTD. |
---|---|---|
Address Of The Project | : | Near Hero Honda Chowk |
Value Of Project | : | 22 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
SafiqueSahab (Ruby Fashions)
Name Of The Project | : | Ruby Fashions |
---|---|---|
Address Of The Project | : | C-40, Sector-6, Noida, UP |
Value Of Project | : | 12 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
SafiqueSahab (Ruby Fashions)
Name Of The Project | : | Ruby Fashions |
---|---|---|
Address Of The Project | : | C-41, Sector-6, Noida, UP |
Value Of Project | : | 12 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
K.L. Rao (K. L. Rao Packaging Industries)
Name Of The Project | : | K. L. Rao Packaging Industries |
---|---|---|
Address Of The Project | : | Plot No. 264, Sec-6, IMT Manesar |
Value Of Project | : | 9 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
Mr. S. K. Jain (Al-fallah University)
Name Of The Project | : | Al-fallah Charitable Trust |
---|---|---|
Address Of The Project | : | Dhauj Village, Pali-Sohna Road, Faridabad |
Value Of Project | : | 101 Lacks |
Period Of Completion | : | Running |
System Installations | : | SITC of Fire Protection System |
Mr. Sanjeev (Panchayat Restaurent)
Name Of The Project | : | Panchayat |
---|---|---|
Address Of The Project | : | Islampur Market, Sohna Road, Gurgaon |
Value Of Project | : | 11 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
Mr. Sanjay Goel (VP, Purchase, Hotel Hans Pvt. Ltd.)
Name Of The Project | : | Anya Hotel, Gurgaon |
---|---|---|
Address Of The Project | : | Golf Course Road, Gurgaon |
Value Of Project | : | 8.5 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Repair & Maint. of Fire Protection System |
Mr. Sidhartha (Tex an Lab Pvt. Ltd.)
Name Of The Project | : | Tex an Lab Pvt. Ltd |
---|---|---|
Address Of The Project | : | Plot No. 119, UDV-IV, Gurgaon |
Value Of Project | : | 9.4 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Repair & Maint. of Fire Protection System |
Mr. Pardeep Kalyan (Premier Urban)
Name Of The Project | : | Premier Urban Residential Society |
---|---|---|
Address Of The Project | : | Sec-15, Part-I, Gurgaon |
Value Of Project | : | 13.0 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Repair & Maint. of Fire Protection System |
Mr. Rajiv Kehr (MD, Aditya Dispomed Products Pvt. Ltd.)
Name Of The Project | : | Aditya Dispomed Products Pvt. Ltd. |
---|---|---|
Address Of The Project | : | Plot No. 19, Sector-6, IMT Manesar |
Value Of Project | : | 24.35 Lacks |
Period Of Completion | : | Running |
System Installations | : | SITC of Fire Protection System |
Mr. Sanjay Goel (VP, Hotel Hans Pvt. Ltd.)
Name Of The Project | : | Hotel Hans Pvt. Ltd. |
---|---|---|
Address Of The Project | : | Plot-3, Sec-39,Golf Course Road, Gurgaon |
Value Of Project | : | 2.35 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Maintenance of Fire Protection System |
Mr. Sidhartha (Texnlab Laboratories Pvt. Ltd.)
Name Of The Project | : | Texnlab Laboratories Pvt. Ltd. |
---|---|---|
Address Of The Project | : | Plot-119, UDV-IV, Gurgaon |
Value Of Project | : | 3.5 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Maintenance of Fire Protection System |
Mr. Navin ( Owner, Twins Car Care Pvt. Ltd.)
Name Of The Project | : | Twins Car Care Pvt. Ltd. |
---|---|---|
Address Of The Project | : | Near Subash Chowk, Sohna Road, Gurgaon |
Value Of Project | : | 4.7 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Maintenance of Fire Protection System |
Mr. Pankul Luthra (Dir. Helious Life Style Pvt. Ltd.)
Name Of The Project | : | Helious Life Style Pvt. Ltd. |
---|---|---|
Address Of The Project | : | Khasr-326A, Village-Sikanderpur,, Gurgaon |
Value Of Project | : | 12.5 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
Mr. Kapoor (Dir. NXTGEN Impex Pvt. Ltd.)
Name Of The Project | : | NXTGEN Impex Pvt. Ltd. |
---|---|---|
Address Of The Project | : | Khasr-1367/601,Khandsa , Gurgaon |
Value Of Project | : | 23.9 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
Mr. Naveen (Mgr. Pes Spray Tech. Pvt. Ltd.)
Name Of The Project | : | Pes Spray Tech. Pvt. Ltd. |
---|---|---|
Address Of The Project | : | 1380, Maruti Vihar, Chakkarpur, Gurgaon |
Value Of Project | : | 2.9 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Maintenance of Fire Protection System |
Dr. Atul Ahuja (Dir. Vatika Hospital Pvt. Ltd.)
Name Of The Project | : | Vatika Hospital Pvt. Ltd. |
---|---|---|
Address Of The Project | : | Vatika Chowk, Sohna Road, Gurgaon |
Value Of Project | : | 21.5 Lacks |
Period Of Completion | : | Completed |
System Installations | : | SITC of Fire Protection System |
Mr. Pankul Luthra (Dir. Helious Life Style Pvt. Ltd.)
Name Of The Project | : | Helious Life Style Pvt. Ltd. |
---|---|---|
Address Of The Project | : | Khasr-326A, Village-Sikanderpur,, Gurgaon |
Value Of Project | : | 12.5 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Maintenance of Fire Protection System |
Mr. Deepak (Vivo Mobile India Pvt. Ltd.)
Name Of The Project | : | Vivo Mobile India Pvt. Ltd. |
---|---|---|
Address Of The Project | : | Golfcourse Road, Gurgaon |
Value Of Project | : | 22.5 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Maintenance of Fire Protection System |
Mr. Srivastava (Leakless Gaskets Pvt. Ltd.)
Name Of The Project | : | Leakless Gaskets Pvt. Ltd. |
---|---|---|
Address Of The Project | : | Bawal Industrial Area, Bawal |
Value Of Project | : | 16.5 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Maintenance of Fire Protection System |
Mr. Srivastava (Leakless Gaskets Pvt. Ltd.)
Name Of The Project | : | Niston & Amitsu Pvt. Ltd. |
---|---|---|
Address Of The Project | : | Bawal Industrial Area, Bawal |
Value Of Project | : | 21.78 Lacks |
Period Of Completion | : | Completed |
System Installations | : | Fire Protection System |
Copyright © 2018 Manglam Fire Protection System